Fire Pump Flow Test In Covington Ga May 14 2018 Youtube

fire Pump Flow Test In Covington Ga May 14 2018 Youtube
fire Pump Flow Test In Covington Ga May 14 2018 Youtube

Fire Pump Flow Test In Covington Ga May 14 2018 Youtube This video shows the flow meter during a flow test of fire pump. This video demonstrates how to perform an annual fire pump test on a horizontal mounted electric fire pump.

fire pump flow test youtube
fire pump flow test youtube

Fire Pump Flow Test Youtube Watch all our videos: channel ucz n8u2xzgexmzxi5sr6gcq videosin this video, we walk you through the process of testing a fire. The test header has two 2 1 2" connections. with a hose monster and 15 feet of hose connected to the pump test header, we are only able to flow about 400 gpm out of the test header. at this flow rate, the suction side fire pump gauge reads 20 psi and the discharge reads 25 psi. in short we are not getting the 100% flow (of 500 gpm) or the. Recommend keeping the test header. nfpa 25, 2017 edition. 8.3.3.6 the annual test shall be conducted as follows: (1) the arrangement described in 8.3.3.6.1 or 8.3.3.6.2 shall be used at a minimum of every. third year. (2)* the arrangement described in 8.3.3.6.3 shall be permitted to be used two out of every. three years. 1. pump house room inspection. check for cleanliness and organization. inspect for any signs of water leakage or environmental issues. verify that access points are clear and accessible. 2. fire pump system inspection. inspect the pump, motor, and associated components for visible damage or wear.

The fire pump flow test Nfpa 25 Annual fire pump tests
The fire pump flow test Nfpa 25 Annual fire pump tests

The Fire Pump Flow Test Nfpa 25 Annual Fire Pump Tests Recommend keeping the test header. nfpa 25, 2017 edition. 8.3.3.6 the annual test shall be conducted as follows: (1) the arrangement described in 8.3.3.6.1 or 8.3.3.6.2 shall be used at a minimum of every. third year. (2)* the arrangement described in 8.3.3.6.3 shall be permitted to be used two out of every. three years. 1. pump house room inspection. check for cleanliness and organization. inspect for any signs of water leakage or environmental issues. verify that access points are clear and accessible. 2. fire pump system inspection. inspect the pump, motor, and associated components for visible damage or wear. While a reduction in output is usually a matter of concern, a.8.3.7.1 of nfpa 25 warns that it should be evaluated in light of meeting the pump’s rated characteristics. to pass an annual flow test, fire pump performance at each flow and pressure point must not be less than 95 percent of the nameplate data. Monthly fire pump churn test. the 2011 edition of nfpa 25 requires electric motor driven fire pumps to be operated monthly. the monthly churn test requires electric powered pumps to be tested as follows: run pump for a minimum of 10 minutes. record the system suction & discharge pressure gauge readings. check the pump packing glands for slight.

Comments are closed.